Member Area

About the project




LUREDERRA TECHNOLOGICAL CENTRE
Coordination and management. Lurederra will actively participate in the specifications of the different parts of the line.

BILDU LAN SCOOP
They will participate in the construction and optimization of the purification process. Besides, BilduLan will develop the main role in the assembly of the line.

LUNARAPID SL
They will participate in the definition of the logistic pattern and will collaborate in the design of the line from the initial wastes point of view.

ZABER SP.ZOO
Zaber will be in charge of the design and fabrication of the heat-energy systems of the line.

PHB
PHB will contribute in the design of the PVB glass separation line taking into consideration requirements and global assembly.

MOS
They will take part in the design and construction of the separation system.

INGENIERIA NAVARRA MECANICA SL

Replacing the partner Bildu Lan, the company INM will participate in the construction and optimization of the purification process. Besides, INM will contribute in the assembly of the line.